in Addis Ababa Ethiopia sales price shop near me near me shop factory supplier High Speed Weaving Machine 2 manufacturer best Cost Custom Cheap wholesaler

  in Addis Ababa Ethiopia  sales   price   shop   near me   near me shop   factory   supplier High Speed Weaving Machine 2 manufacturer   best   Cost   Custom   Cheap   wholesaler

“We are often serving our clients with our greatest merchandise.” The merchandise properly shows environmental defense and power saving. In this way, our goods have ongoing to achieve marketplace acceptance and customers fulfillment above the previous couple of many years.

The EPT motor of PGF hello-speed knitting EPTT is utilized with the technique of frequency conversion, which allows the stepless velocity handle even throughout the operation, for example: although the feeding breaks (finishes), the EPTT is routinely stopped although the car feeding device is utilized for knitting main fabirc, for the two thick or slender core material in the restrict, the supply is uniform the EPTT is also stopped immediately while main breaking(finishing) to avoid degrated merchandise. And the braided fabric that is manufactured with PGF hello-speed knitting EPTT is of higher qualify and far more reliable.

II, Functions AND Material OF KNITTING
PGF hi-speed knitting EPTT is able to knit curtain belt, shoe belt, cummerbund of the designs of column, pipe, and flat, and pipe-condition jacket, and so on.
A variety of types of material are adoptable for PGF hello-pace knitting EPTT, this sort of as cotton yarn, chemical fibre yarn, silk, delicate steel wire, and so on.

III, Features
PGF hello-speed knitting EPTT is of the shut structure, handy for procedure, very automated, swift for adjustment, reliable for operation, of reduce sounds, of larger efficiency, of EPT good quality and so on.

IV, Operation Techniques
Ahead of commencing the EPTT, shall check the following products:
one no matter whether the EPTT force is correct
2 regardless of whether the earth device is dependable
3 regardless of whether the motor steering is proper
4 clean up the table, and other obstructions that influence the operation of the EPTT
five whether the EPTT oil is certified (oil model, oil volume)
As soon as the over objects are checked and passed, follow up the beneath processes to begin the EPTT:
one connect the EPTT (EPTT two stage 380v)
two transfer the change of EPT box to the stage of quotON quot(the EPTT offer indicator is on, which means it is EPTTed)
3 push the start off button
4 switch the rotating-set up button clockwise
5 refer to the guide of frequency conversion EPTT to procedure the EPTT.

V, Treatment method FOR YARN-BREAEPT (FEPTSHING)
If the yarn breaks(finishes) although the EPTT is doing work, the breaking indicator is on. Examine each and every yarn cop. If the yarn is damaged, pull the conclude of that yarn in direction of the finished knitting, and then push the startup button if the yarn cop is vacant, just take off that a single, and exchange it and thread the yarn and pull the end of yarn toward the concluded knitting, and then press the startup button. If the core is broken, check the main unEPTTthe EPTT human body, and pull the stop of the core toward the concluded 1, and then push the button to knit.

VI, ADJUSTMENT OF Sure Pace
To alter the pace of the leading still left EPT on the cEPTTr column can get different speed of certain, and distinct sheer-shape cross details of each and every duration in mm (or named as solution density, item no.)

Refer to the beneath chart and desk one for particulars

DIAGRAM OF Gear

Distinction table in between the sure speed of hi-speed knitting EPTT and EPT EPTTble 1
(from the still left to the right)
Frequency of motor: 60HzZB=30ZC=28
ZA velocity of bound CM/min amount of sheer-condition cross level/CM

Frequency of motor: 60HzZB=30ZC=36
ZA pace of bound CM/min quantity of sheer-shape cross position/CM

Frequency of motor: 60HzZB=30ZC=38
ZA pace of sure CM/min number of sheer-shape cross stage/CM

Observe: While the frequency of motor is not 60HZ, the speed of bound is that the worth in the above desk moments the genuine perform frequency/sixty, and the sheer-shape cross stage is not transformed.

VII, Routine maintenance INTRODUCTION
For the EPTT that is being utilized, should lubricate its direct, spline ingot groove, and the lubrication quantity can not spill over, and it is very best to lubricate it just keeping away from dry-working. Should add oil on the concave ring of spline shaft, at lEPT two moments for each eigEPTT several hours, a number of drops per time.
The oil that is mainly employed on the spline EPT box need to be replaced totally following a single month, and then, is to be supplemEPTTd in accordance to oil scale amount. During the creation, determine whether to exchange lubrication (the lubrication utilized on the EPTT is 32#) according to the oil status. Shall cleanse up the float on any parts often (do not do it although the EPTT is running).

VIII, Safety measures for Installation and Assembly amp Unassembled
Set up: should put the EPTT on the rigid ground, and should hold it in stage soon after while putting in the rear desk board.
Hanging Set up: if this EPTT is moved right after dis-packaged, whether or not for forklift or crane, the level of power shall alwaEPTTbe set on the reduced crosspiece unEPTTthe holEPTTof the quadrate pipe EPTT, must not on the desk board of the knitting EPTT.

EPTTAL Element

Hello-pace sealing knitting EPTT Operation manual Whole eleven web pages
Webpage 6
seven.two normal faults and remedy approaches for frequency conversion EPTT in beneath desk

Fault show Fault content amp description Remedy methods
E.O.C.A Overcurrent in acceleration one, verify regardless of whether the motor is shorted or partly shorted
two, extend the acceleration time
3, the configurations of frequency conversion EPTT is not rational, and EPT the ability of the frequency conversion EPTT
4, lessen the torque to enhance the rated value.
E.OC.n Overcurrent in constant velocity 1, examine regardless of whether the motor is shorted, no matter whether the output wire is insulated properly
2, examine whether the motor is stopped to run, whether or not the mechanical load waves
3, check out no matter whether the potential of the frequency conversion EPTT is as well little, and EPT the capacity of the frequency conversion EPTT
four, check no matter whether .the voltage of the EPTT community waves.
E.OC.d

E.OC.S

Overcurrent in deceleration
Overcurrent in stopping
1 check out no matter whether the wire insulation is well, whether the motor is shorted
2 EPT the deceleration time
three substitute by a frequency conversion EPTT of larger capacity
four the braking ability of direct recent is as well big, and decrease the braking ability of immediate current
5 for the EPTT fault, ship back to the manufacturing facility for repair.
E.GF.S
E. GF.a
E. GF.n
E. GF.d
Shortcut to floor one examine whether the wire of motor is shorted
two improve the EPTT community, and verify whether there is the wave of voltage
three ship again for restore
E.ou.S

E.OU.a

E.OU.n

E.OU.d

Overcurrent in acceleration
Overcurrent in deceleration
Overcurrent in consistent velocity
Overcurrent in deceleration
one prolong the deceleration time, or insert with the brake resistor
2 increase the EPTT network, and check out whether there is the wave of voltage.
E.Fb.S
E. Fb.a
E. Fb.n
E. Fb.d
Fuse melted

If fuse melted, send out again for fix
E.Lu.s
E. Lu.A
E. Lu.n
E. Lu.d
Lower voltage 1 check out no matter whether the voltage is typical
2 verify regardless of whether the load waves
3 verify whether or not the stage is lacked.
E.OH.S
E. OH.A
E. OH.n
E. OH.d
Overheat of frequency
conversion EPTT
one check out no matter whether the admirer is stopped to operate, regardless of whether the radiating piece is coated by imEPT
two verify whether or not the setting temperature is normal
three verify whether the airing place is adequate, whether the air is convective
E. OL.A
E. OL.n
E. OL.d
Overload of frequency
conversion EPTT
one hundred fifty% per moment
one check no matter whether the frequency conversion EPTT is of more compact capacity, whether or not is coated by imEPT
2 verify whether the load of the EPTT is blocked
three V/F curve is not set nicely, and shall be reset.

Hello-velocity sealing knitting EPTT Procedure manual Overall eleven pages
Webpage seven
ongoing

E.OA.A
E.OA.n
E.OA.d
EPT overload 150% for every one particular moment one examine whether or not the mechanical load moves
2 the motor distribution is too small
3 the motor is overheated, and the insulation gets even worse
4 check whether the voltage moves greatly
5 verify regardless of whether the phase is lacked
6 the mechanical load is EPTd.
E.OT.A
E.OT.n
E.OT.d
In excess of-torque of motor one check out regardless of whether the mechanical load moves
2 check whether the motor configuration is too modest.
E.bs.A
E. bs.n
E. bs.d
E. bs.s
The electromagnetic contactor assistant coil does not opinions. Ship again for restore
E.bT.A
E. bT.n
E. bT.d
The brake transistor is broken. Make contact with with the manufacturing unit.
E.EC.S
E. EC.n
E. EC.d
E.EC.A
CPU fault Get in touch with with the manufacturing facility.
E.EE.S
E. EE.n
E. EE.d
E.EE.A
E Promenade fault Get in touch with with the manufacturing facility.
ER External interference Insulation with the interference useful resource
ES Emergency parking UnEPTTthe crisis standing
20 four-20mA damaged circuit EPT with the previously mentioned damaged a single
Pr Blunder of specification setup Appropriate specification of set up
DCb Brake status of direct current UnEPTTthe brake status of immediate existing

Hi-pace sealing knitting EPTT Operation manual Overall 11 web pages
Webpage 8
VIII, Essential operate, function show, operation introduction of HLPC 0D7523A EPTT operation EPTT
eight.1 important operate of HLPC 0D7523A EPTT procedure EPTT

one PROG programming/function screen essential
two EPTTR/DISP essential of info affirmation, soon after the info is amended, press this important to validate the entry of data
three up/down keys, decide on specification, amend info and so on.
4 Run demand key of operation, commence procedure
5 Stop/RESET quit/ reset important, end operation, and the procedure is disturbed, and reset
six FREQ Set frequency setup button, can established up this button in orEPTTto enter the main frequency.

Hi-pace sealing knitting EPTT Procedure guide Complete 11 internet pages
Web page nine
eight.2 Explanation of purpose display items

  1. T 50. frequency charge fifty. HZ
  2. F 50. rated frequency fifty. HZ
  3. R 02. output of current two.0A
  4. U220 output of voltage 220V
  5. U540 direct voltage 540V
  6. r 39. temperature 39 ordmC
  7. .001 counter
  8. L50. PID feedback is fifty%
  9. 000. managing velocity
  10. Fo r positive working
  11. r EU unfavorable operating

Hi-velocity sealing knitting EPTT Operation manual Complete 11 webpages
Web page ten
8.three Explanation of keyboard

EPTT on #8594 exhibit F00.(push PROG) #8594display FOR or REV (press PROG) #8594 present C000 (the operate code choice interface can make use of #9661 #9651keEPTTto alter the flash digit quantity, the previous digit flashes) #8594 (press EPTTR) existing C000 (The first digit flashes) #8594 (press EPTTR) current C000 (The very first digit flashes) #8594 (press EPTTR) existing C000, the previous digit flashes.

Example: c111 is set as two, as adhering to
EPTT on #8594 show F00. #8594 FOR #8594C000 (the last digit flashes) #8594C001 (the previous digit is changed into one, and flashes) push EPTTR #8594C001 (The center digit flashes) push #9651 #8594C011 (the middle digit is changed into one, and flashes) push EPTTR #8594C011 (The 1st digit flashes) press #9651 #8594C111 (the first digit is altered into 1, and flashes) press EPTTR EPTT #8594present (push #9651) #8594present two (existing EPTTr EPTT, and it is okay) #8594C112

Hi-velocity sealing knitting EPTT Operation guide Total eleven internet pages
Web page 11
VIII, EPT Diagram (see attachment)

VV, In depth EXPLAINATION OF FREQUENCY CONVERSION EPTT

I. EPTT Introduction
The substantial-pace braiding EPTT makes use of a kind of EPTT and novel layout. 4 16-spindle braiding EPTTs are built-in into one particular unity. By utilizing the VFD-A sort alternating existing motor EPTr that is made through combining the pc manage EPT, the centralized frequency-adjust and stepless speed regulation can be realized. The EPTT is offered with numerous kinds of computerized protective capabilities this kind of as: automated end whilst the line breaks, in excess of torque, above voltage, unEPTTvoltage, overheating, more than load and so on. The EPTT also has numerous outstXiHu (West EPT) Dis.Hu (West EPT) Dis. benefits, for case in point: substantial rotate velocity, substantial creation efficiency, little floor region, low sound, EPTT services life and effortless procedure as well as strength preserving. It is the upgrading and new era product of conventional disc braiding EPTT.
II. Fundamental EPTnical Parameters
Rated EPTT of motor: 075W
Rated velocity of motor: 1390r/min
Quantity of spindle: 16*4 960*790*700(L*B*H)
24*2 1240*620*seven hundred(L*B*H)
Specification of quill:( Phi48*a hundred and sixty)mm
Spindle velocity: 350r/min
Technique of speed adjustment: frequency-alter and stepless speed regulation
III. Services Problems
Voltage of EPTT offer: AC220V plusmn10%HUO or AC380V plusmn10%
Frequency of EPTT supply: 50HZ plusmn5%
Ambient temperature: -10 ordmC-forty ordmC(no condensation and no freeze)
Ambient humidity: unEPTT90%RH(no condensation)
Operating environment: no h2o droplets, steam, dust and grease stain
no putridity, flammable fuel and liquid
no drifting dust and steel particle
strong foundation, no critical vibration
no interruption of electromagnetic sound.
IV. Set up
4.1The equipment fixture foundation are not necessary for the set up of this EPTT. Only spot the EPTT on the solid and even concrete floor and maintain amount without having vibration.
four.2 Configuration of EPTT EPT
four.two.one According to the buyer demand from customers, the EPTT may possibly supply large pace braiding EPTTs that are used to two kinds of voltage ranges: 220V, 50HZ and 380V, 50HZ. The consumer shall link lines accurately according to the appropriate voltage level of purchased gear. Be certain no wrong relationship so as to avoid that the EPTT are not able to function typically or any harm takes place.
4.2.two When consumer disposes the EPTT supply of substantial velocity braiding EPTT, remember to EPTTly care whether there is a trustworthy ground line in the electrical energy grid (SV220VAC380V)system (i.e. No matter whether there is reputable grounding for socket grounded phase of EPTT supply AC220V or AV380V). If not, an extra protecting ground line for the EPTT need to be produced. Its foundation resistance shall not be above four Omega. And then merge it into the grounded stage of EPTT socket (SV220V or AC380V) or inducted to the grounding conclude of the EPTT right.

four.two.three The EPTT line connection of the EPTT is presently done for end users. The grounded phase of EPTT provide plug is rightly related with grounding conclude of the EPTT. The consumer just demands to insert the EPTT provide plug into the EPTT supply socket that is ready in accordance to appropriate voltage amount to connect the existing.
four.three In the scenario of not connecting the present, open the doorway of EPT handle box with the offered key to verify regardless of whether electrical factors in EPT manage box are ruined or loosening. If the connecting line is loosening, appropriate measures must be accomplished in time.
5.1 No-load Test
5.one.1 Change on the EPTT source of EPT manage box
five.1.2 Turn on the change of EPTT supply inside the EPT handle box. If the indicating lamp of EPTT source on the manage panel and relevant indicating lamp on EPTT operator panel of frequency changer illuminate, it is indicated that almost everything is rigEPTT and no-load check can be operated.
five.1.three Turn the velocity-regulating potentiometer of frequency placing knob on the EPT manage box panel again to the scale fifty(anti-clockwise rotation). Instantaneously push the button to make the EPTT to rotate instantaneously and look at no matter whether it is rotating clockwise or not. If not, trade the positions of U and V of output port of frequency changer. Watch and make sure that the all working is fleXiHu (West EPT) Dis.ble and easy to ensure no obstacles and abnormal clash. If anything improper transpires, pertinent motives ought to be identified in orEPTTto resolve the issue.
five.1.four Press the startup button on handle panel, then gradually elevate the managing pressure of alternating motor EPTr (i.e. little by little rotate the potentiometer knob clockwise) at the same time, view and make sure that the speeds of motor and rotation board are rising progressively and that the managing is regular.
five.one.five Push the cease button on control panel and view no matter whether the motor is synchronized with the instruction. If not, the reason shall be identified in orEPTTto remove the fault.
5.2 Load Take a look at
5.two.one After no-load test is finished, the load take a look at can be operated. Spot the braiding spindle into the desktop XiHu (West EPT) Dis.Hu (West EPT) Dis.. Equip the braiding spindle with the essential specified quill with the necessary shade yarn according to the extravagant yarns that will be weaved and get every little thing completely ready.
five.two.2 Switch the pace-regulating potentiometer knob on the EPT handle box panel back again to the scale , instantaneously press the button to switch on motor and make it rotate. Watch that the running of quill has obstacle or clash. If some thing wrong happens, the explanation shall be found in orEPTTto eliminate the fault.
5.2.three Press the startup button and switch the velocity-regulating potentiometer knob. Make the motor to preserve running for a even though(five~10min)in the pace of 1000r/min. If everything is appropriate, reduce off 1 yarn by handbook. If the motor is turned off at once, it is proved that automatic cease protective unit is delicate. So, the EPTT examination is concluded totally. The EPTT can be put into the regular generation.
VI. Distinct Notices
In orEPTTto guarantee the securities of folks and tools and get the best provider result, we would like to especially rXiHu (West EPT) Dis.Hu (West EPT) Dis.d all of customers that adhering to circumstances should be paid much more attentions whilst putting in this EPTT.

6.1 The workshop with the installation of this EPTT need to have excellent ground wire with ground resistance of less than four

six.two This EPTT need to be grounded independently it shall not be jointly grounded with higher electric powered-present EPTTs, this sort of as electric welding EPTT and high-EPTT electrical motor. The EPTal region of ground line must be equivalent or much more than 4mmtwo.
six.3 Ahead of this EPTT is still left from the production manufacturing unit, for 108 parameters of frequency changer, pursuing eighteen parameters (see desk one) need to reset in accordance to needs of the EPTT technological functionality, and the other one hundred thirty parameters are all held as what they are set at producing manufacturing unit. If there is no EPTT demand, consumers you should do not randomly adjust frequency changer parameters any a lot more.

Perform code Perform Setting scope and perform explanation Set worth
C001 Accelerating time location .one~6500S 4
C006 Intermediate voltage environment .one~255/510 13
C007 Intermediate frequency placing .01~600 two.5
C571 Max. frequency placing fifty.~600. fifty
C012 Working management environment ~two one
C013 Operating frequency option ~2 one
C015 Stopping way option ~1 1
C016 Reverse turning option ~one one
C571 Startup frequency location .one~ten five
C571 Inching frequency setting ~600 20
C033 Accelerating time placing .one~6500S three
C050 Multi-functional input conclude FOR one
C051 Multi-useful input end REV 4
C053 Multi-purposeful enter finish SPH 7
C075 Analog quantity EPT environment .~600 fifty
C088 EPT rated rotate velocity ~9999 270
C100 EPTT torque compensation .~ten. 5

six.four When frequency changer outputting, in output facet principal circuit, alternating current making contact with spot is not permitted supplying and breaking EPTT offer.
6.5 When the temperature in workshop surpasses 40 ordmC, forced air cooling evaluate should be adopted to EPT control box.
6.six When more than torque or other faults take place, just before the cause is clear and faults are solved, frequency changer are not able to be commenced once again in orEPTTto steer clear of bringing harm to the EPTT. The technique of restarting frequency changer is: one. Firstly push the RESET button on frequency changer EPTT operator panel and then press the stop button on main managing EPT box procedure panel and ultimately press the startup button 2. Swap off the EPTT supply in main managing EPT box and swap on yet again, and then press the startup button.
six.seven When the swap of EPTT source in EPT manage box is turned off and before indicating lamp on frequency changer EPTT operator panel goes out, any portion of circuit within EPT manage box can not be touched or any assembly and disassembly and wiring can not be carried out.
6.8 Following braiding spindle is set up in the quill, reverse turning is not allowed any a lot more in this EPTT.
six.nine Max. operating rotate pace of this EPTT is developed as 350r/min, but actually cost-effective rotate speed is about 300r/min. Just before this EPTT leaves production manufacturing facility, its max. operating rotate speed is established to be restricted inside of inexpensive rotate speed scope. Customers please do not randomly modify corresponding parameters any a lot more to improve the pace. In this way, EPTT accident can be avoided.
six.ten This EPTT can not operate EPTT time (less than 30min) at lower speed of much less than 100r/min, otherwise electric motor will be destroyed because of to overheating.
six.eleven It is unfavorable for this EPTT to be started out and stopped at low or higher rotate speed (when the EPTT is commenced, if rotate velocity is as well minimal, commencing torque is minimal and this EPTT is challenging to be began up but if rotate velocity is way too high, starting current is also large and frequency changer is simply overloaded. When the EPTT is stopped, if rotate pace is also large, frequency changer is effortlessly to be over voltage. When the EPTT is began up, please to begin with turn the knob of pace-regulating potentiometer on EPT control box operation panel to the scale fifty (about 100r/min) and then press the startup button. When the EPTT is stopped, please change the knob of velocity-regulating potentiometer back to the scale fifty and then press the stop button.
6.twelve Pressure-evidence test of spare parts inside frequency changer is forbidden.
six.thirteen The important of EPT management box of this EPTT is held by its operator. And non-operator can’t run main controlling EPT box.
6.fourteen The electrical portion of this EPTT must be taken care of and repaired by experienced and specialist EPT technicians.
7.Typical faults and remedies
7.one Frequent faults and options of EPT handle circuit can be witnessed in table two.

EPT-pace Braiding EPTT Instruction Total web pages
No. Website page
No. Fault Fault purpose and remedy
1 Change on EPTT supply 1.1 Indicating lamp does not light-weight line end looses or fuse breaks
2 Inching button 2.1 Electric powered motor cannot run instantaneously
two.one.one Inadequate contact of the button
two.one.two Blunder of parameter placing
two.1.3 Fault of frequency changer
two.1.four Inadequate get in touch with of electric powered motor connection or fault of electrical motor
two.1.five Road blocks at working portion of the system
three Press the startup button
4 Press the cease button
five EPTT quit can’t look when the line breaks five.1.one Fault or hurt of digital circuit
5.twelve Mini-relay
5.one.3 Fault of EPTT transformer
5.1.four Harm or poor get in touch with of line-break mini-relay

  in Addis Ababa Ethiopia  sales   price   shop   near me   near me shop   factory   supplier High Speed Weaving Machine 2 manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Addis Ababa Ethiopia  sales   price   shop   near me   near me shop   factory   supplier High Speed Weaving Machine 2 manufacturer   best   Cost   Custom   Cheap   wholesaler